Chapter 2 installation and operation, Figure 2-1. gpib-buf system setup example, Figure 2-1. gpib-buf system setup example -1 – National Instruments GPIB-BUF User Manual

Page 16

Advertising
background image

© National Instruments Corp.

2-1

GPIB-BUF User Manual

Chapter 2
Installation and Operation

This chapter describes the procedures for installing and operating the
GPIB -BUF.

Figure 2-1 shows an example of a GPIB-BUF connected to a GPIB system.
This example shows a GPIB-BUF placed in a GPIB system with a GPIB
Talker/Controller, such as an IBM-PC with a National Instruments
GPIB -PCII Controller board installed, and a slow GPIB data acceptor, such
as an HP 7475A Color Plotter. Notice that the GPIB-BUF is placed in-line
between the existing GPIB system and the GPIB target device.

GPIB Cable

GPIB-BUF

IEEE 488

IEEE 488 BUFFER

POWER

READY

TALK

LISTEN

EMPTY

FULL

NATIONAL

INSTRUMENTS

®

GPIB Cable

Figure 2-1. GPIB-BUF System Setup Example

Advertising