Step 4. connect the cables, Step 4. connect the cables -6 – National Instruments GPIB-BUF User Manual

Page 21

Advertising
background image

Installation and Operation

Chapter 2

GPIB-BUF User Manual

2-6

© National Instruments Corp.

Table 2-2. Configuration Parameters for Switches 4 through 8 (Continued)

Switches

4

5

6

7

8

Indication

ON

OFF

ON

OFF

OFF

Sets GPIB primary address 20

ON

OFF

ON

OFF

ON

Sets GPIB primary address 21

ON

OFF

ON

ON

OFF

Sets GPIB primary address 22

ON

OFF

ON

ON

ON

Sets GPIB primary address 23

ON

ON

OFF

OFF

OFF

Sets GPIB primary address 24

ON

ON

OFF

OFF

ON

Sets GPIB primary address 25

ON

ON

OFF

ON

OFF

Sets GPIB primary address 26

ON

ON

OFF

ON

ON

Sets GPIB primary address 27

ON

ON

ON

OFF

OFF

Sets GPIB primary address 28

ON

ON

ON

OFF

ON

Sets GPIB primary address 29

ON

ON

ON

ON

OFF

Sets GPIB primary address 30

ON

ON

ON

ON

ON

Sets listen-only operation

Step 4. Connect the Cables

Connect the cables as follows:

1.

Connect the power jack of the wall-mount power supply to the power
receptacle on the back panel of the GPIB-BUF, then plug the supply
into an AC outlet of the correct voltage.

2.

Connect a GPIB cable from the target device to the GPIB OUT port on
the rear panel of the GPIB-BUF.

3.

Connect another GPIB cable from the GPIB IN port on the rear panel
of the GPIB-BUF to the remaining GPIB devices in your system.

Note:

In steps 2 and 3, be sure to obey all IEEE 488 cabling
restrictions, and tighten all lock screws on the GPIB connectors.

Advertising