RuggedCom RUGGED VDSL RS910L User Manual

Page 11

Advertising
background image

11

2007 RuggedCom Inc. All rights reserved

Rev100

2.2.3 Dielectric Strength Testing


Units which are to have dielectric strength testing (HIPOT testing) done in the field must have the
braided ground cable disconnected during the test. This is required in order to prevent the surge
suppression circuitry, which is connected to surge ground, from being activated.

Figure 6 - Dielectric Strength Testing


Advertising