Green bag – Vision Fitness ST250 User Manual

Page 13

Advertising
background image

13

6

STEP

• Attach the pulley structure (U) to the
bottom rear floor support of the base
unit with three bolts (M6x1Px15L), three
flat (6.4x14x1T), and three spring
(SW6.1x12.2x1.5T) washers. Tighten
with a 4mm L-shaped wrench.

• Slide pulley structure (Q) through the
back side of the rear vertical support
(base unit) and fasten securely with
two spring (SW10.2x18.4x2.5T)
& flat (10.5x18x2T) washers and two
nuts (M10x1.5P). Use a 17mm wrench.

• Feed the small steel end of cable
#5 through pulleys (in the following
order) F, G, Q, V. Place the slotted
bolt (5a of base unit) around cable
#5. Thread the nuts back on the slotted
bolt. With the threads pointing up,
thread the bolt into the rear termination
tube (6b of base unit) far enough that
the cable is taught. Tighten the locking
nut against the bottom of 6b using a
19mm wrench.

GREEN BAG

F

U

Q

V

6b

F

G

V

Q

Cable #5

Advertising