Wayne-Dalton LIGHT COMMERCIAL DOOR 6100 User Manual

Page 15

Advertising
background image

15

Please Do Not Return This Product To The Store. Contact your local Wayne-Dalton dealer. To find your local Wayne-Dalton dealer, refer to your

local yellow pages/business listings or go to the

Find a Dealer section online at www.wayne-dalton.com

Tools Needed:

Tools Needed:

iNST

alla

Tio

N

center bearing bracket

Power Drill

7/16” Socket Driver

Level

Tape Measure

Pencil

1/4” Torx bit

Step Ladder

Measure to locate the center of the door and mark
a vertical pencil line on the mounting surface above
the door, to indicate the center line of the door. Then,
measure from the center of the bearing, in one of
the end bearing brackets, DOWN to the top of the
door. Using that dimension, measure UP from the top
of the door and mark a horizontal pencil line on the
mounting surface, intersecting the vertical pencil line.
Now align the edge of the center bearing bracket
along the vertical pencil line on the mounting surface.
Center the bearing bracket on the horizontal line.
This will ensure the torsion tube is level between the
center and end bearing brackets. Attach the center
bearing bracket, in this location, to the mounting
surface, using (2) 5/16” x 1-5/8” lag screws and (1)
5/16” x 2” tamper-resistant lag screw.

imPoRTaNT: USE ThE 5/16” X 1 5/8” TAMPER-
RESISTANT LAG SCREW ONLY IF MOUNTING SURFACE
MOUNTED OVER MASONRY. TAMPER-RESISTANT LAG
SCREW MUST bE ATTAChED ThROUGh ThE bOTTOM
hOLE OF ThE CENTER bEARING bRACkET.

14

Center

bearing
bracket

horizontal

line

Vertical

line

(1) 5/16” X 1-5/8” Lag

screw or (1) 5/16” x 2”

tamper-resistant lag

screw

Vertical line

Center of

end bearing

bracket

horizontal line

Center

bearing
bracket

(2) 5/16” X 2”

Lag screws

Torsion end bearing brackets

End bearing brackets are right and left
hand. break the end bearing brackets
apart.
Starting on the left hand side and using
the upper slots in the end bearing
bracket, position above the flagangle
and secure the end bearing bracket to
the horizontal angle using (2) 3/8”-16
x 3/4” truss head bolts and (2) 3/8”-16
nuts.
imPoRTaNT: END bEARING bRACkETS
MUST bE ATTAChED ThROUGh ThE
LOWER SLOTS ON 12” RADIUS TRACk.
15” RADIUS TRACk MUST USE ThE UP-
PER SLOTS ON ThE bRACkET.
Once the bracket is secured to the
horizontal angle, secure the top of the
end bearing bracket to the jamb using
(1) 5/16” x 1-5/8” lag screw. Repeat for
right hand side.
NoTe: Right and left hand is always
determined from inside the building
looking out.

Step L

adder

Power Drill

Ratchet Wrench

7/16” Socket

Driver

9/16” Socket

Driver

9/16” Wrench

LEFT hAND END bEARING

bRACkET

UPPER SLOTS

USED ON 15”

RADIUS TRACk.

LOWER SLOTS

ON 12” RADIUS

TRACk.

(1) 5/16” X 1-5/8”
LAG SCREW

(2) 3/8”-16 X 3/4”
TRUSS hEAD bOLTS

(2) 3/8”-16 NUTS

13

hORIzONTAL

ANGLE

LEFT hAND

END bEARING

bRACkET

RIGhT hAND END

bEARING bRACkET

bREAk

ThE END
bEARING

bRACkETS

APART

hORIzONTAL

ANGLE

Advertising