Table 25: utilities entry data, Front view dimensions, 25 utilities entry data – York DJ 180 User Manual

Page 30

Advertising
background image

261660-YTG-C-0707

30

Unitary Products Group

FIGURE 4 - FRONT VIEW DIMENSIONS

TABLE 25: UTILITIES ENTRY DATA

HOLE

OPENING SIZE

(DIA.)

USED FOR

A

1-1/8” KO

Control Wiring

Side

3/4” NPS (Fem.)

Bottom

B

3-5/8” KO

Power Wiring

Side

3” NPS (Fem.)

Bottom

C

2-3/8” KO

Gas Piping (Front)

1

1.

One-inch gas piping NPT required.

D

1-11/16” Hole

Gas Piping (Bottom)

1, 2

2.

Opening in the bottom of the unit can be located by the slice in
the insulation.

NOTE:

All entry holes should be field sealed to prevent rain
water entry into the building.

11-1/2

(A) CONTROL WIRING

ENTRY

COIL

GUARD

KIT

CONDENSER

COILS

All dimensions are in inches. They are
subject to change without notice.
Certified dimensions will be provided
upon request.

(B) POWER

WIRING

ENTRY

5

9-3/4

21.00

6-3/8

7-1/8

35

5-7/8

136-1/4

GAS OR ELECTRIC
HEAT

ACCESS

DOT PLUG

(For pressure

drop reading)

BLOWER

COMPARTMENT

ACCESS

(Auxiliary)

(C) GAS

SUPPLY

ENTRY

CONTROL BOX

ACCESS

VENT AIR

OUTLET

HOODS

BLOWER MOTOR
ACCESS (Location
of Optional VFD Bypass)

BLOWER ACCESS
(Location of
Optional VFD)

52-5/8

180-19/32

COMPRESSOR ACCESS

DISCONNECT

SWITCH

LOCATION

ECONOMIZER / MOTORIZED DAMPER

FIXED OUTDOOR INTAKE AIR AND

POWER EXHAUST RAIN HOODS

(See detail Y)

92

46-5/8

35-1/4

33

2-3/4

3-3/4

(B) POWER WIRING

ENTRY

BOTTOM SUPPLY

AND RETURN

AIR OPENINGS

(See Note)

(A) CONTROL WIRING

ENTRY

21-1/2

11-1/8

(D)

GAS SUPPLY

ENTRY

UNIT BASE RAILS
Shown separately to illustrate

RETURN

AIR

Bottom Duct openings. Power
and Gas Piping Connection
location.

NOTE:
For curb mounted units, refer to the curb hanger
dimensions of the curb for proper size of the
supply and return air duct connections.

12-1/2

9-1/4

8-1/8

46-5/8

9-3/4

COMBUSTION

AIR INLET HOOD

SUPPLY

AIR

Advertising