13

English

2. Installation instructions

for the qualified installer

2.1 Structure of the device

A

D

M

1 Temperature selection switch

2 Signal lamp for operating mode display

3 Lights for the heat content display

4 „SERVICE ANODE“ signal lamp

5 Operating panel

6 Hot water outlet nozzle G ½

7 Cold water inlet nozzle G ½

8 Inflow

9 Cable duct PG 21 for electrical

connection

10 Drain valve with hose connection G ¾

11 Pressure switch for signal anode

12 Reset button for safety temperature

limiter (actuation from the front)

13 Regulator-limiter combination

14 Seal

15 Cover caps

16 Signal anode

– SH 30 S (M 8):

Replace with heating element fitting

– SH 50 - 150 S (G 3/4):

Replace without heating element fitting

17 Heating element

18 Outflow pipe

19 Suspension bar top*

20 Suspension bar bottom*

(on SH 120 S and SH 150 S)

21 Thermostat

22 Safety temperature limiter

23 Pressure switch for signal anode

24 Heat content display

25 Plug distributor for N-lead

26 Terminal for power switchover
* For screws dia. 12 mm provided by

customer

2.2 Fittings

• Unvented (pressurized) mode of opera-

tion: Safety groups kV 30 or kV 40

F

.

• Vented (pressureless) mode of operation:

Fittings without pressure

G

.

2.3 Regulations and
provisions

• The installation (water and electrical

installation) and first start-up, as well as the
maintenance of this unit may only be
carried out by an approved specialist
installer in accordance with these
Instructions.

• Perfect function and operational safety are

only guaranteed with original accessories
and spare parts intended for the unit.

y

The installation should be carried out in
accordance with the relevant water
(WRAS) and electrical (IEE) guidelines and
regulations.

y

Installation should be carried out in
accordance with the relevant water and
electricity supply companys regulations.

The following are also to be respected:
• The unit rating plate

• Technical data

Water installation

Pipe material:

– Cold water pipe

– Hot water pipe

Copper pipe

Copper pipe

Steel pipe

Steel or copper pipe

Plastic pipe systems with the instantanous
water heater the operating temperature
can be adjusted upto max. 82 °C. The
maximum temperature can be limited to
65 °C. In case of failures temperatures can
rise up to 95 °C (max. 0.6 MPa).
The assigned plastic pipe system must be
appropriate for these conditions.

Electrical installation

– Electrical connection only with fixed-laid

leads in association with removable

cable bushings.

– The unit must be capable of all-pole

disconnection from the mains, for
example by fuses, with an isolating
distance of at least 3 mm.

2.5 Installation location

• In an area not subject to the risk of

freezing.

• Install close to the water tap.

2.6 Unit installation

E

• Fit the suspension bracket.

Select the securing material to suit the
strength of the wall. With SH 120 S and
SH 150 S, two suspension brackets are
required.
Any unevenness in the wall is to be
compensated for by the spacer elements
provided (a. approx. 5 mm thick).

• Install in a vertical position; see

D

.

• Push the cover caps onto the suspension

bracket

E

(b).

2.7 Water connection

Unvented (pressurized) for the

supply of several draw-off points.

– Install the type-tested safety groups

F

KV 30, Order No. 00 08 26, up to

0.48 MPa water pipe pressure

KV 40, Order No. 00 08 28, up to 1 MPa

water pipe pressure

a Safety valve

b Backflow preventer

c Test valve

d Throughflow isolating valve (choke)

e Pressure reducer (with KV 40)

f Test nozzle for pressure gauge

g Thermostat fitting TA 260 Order No.

00 34 66 (order separately), also

possible in conjunction with KV 40.

– Establish dimensions for the outflow pipe

for a fully-opened safety valve. The drain
aperture of the safety valve must remain
open to the atmosphere.

– The drain for the safety group is to be

installed with a constant downwards
inclination.

– The information provided in the

Installation Instructions for the safety
group are to be respected.

– Set a maximum flow rate of 18 l/min at

the choke of the safety group.

Vented (pressureless) for the supply

of one single draw-off point

The units are suitable for vented
(pressureless) operation mode.

Do not block off the drain and
fittings pivot arm.

– With this installation the Stiebel Eltron

fittings for vented wall-mounted water
heaters

G

are to be used.

– Before connecting the fitting the water

pipe must be thoroughly flushed through.

– For use, installation, first start-up, and

maintenance, the same instructions apply
as for the operation of unvented
(pressurized) water heaters.

Instructions for „Signal anode in
unpressurized operating mode“
the page 14.

2.4 Technical data

(the data on the unit rating plate are applicable)

Type

SH 30 S

SH 50 S

SH 80 S

SH 100 S

SH 120 S

SH 150 S

Mixed water quantity l 59

97

159

198

235

292

40 °C (15 °C / 65 °C)

Capacity

l 30

50

80

100

120

150

Weight empty

kg 23,1

28,0

38,0

40,8

45,5

53,3

300

Connectable to power

1 - 4 kW

1/N/PE ~ 230 V

sources

3 - 4 kW

2/N/PE ~ 400 V

6 kW

3/N/PE ~ 400 V

Permissible operating pressure

0.6 MPa (6 bar)

Protection class EN 60529

IP 25 D

Test marking

See unit rating plate

Water connection

G ½ (external thread)

Flow rate

max. 18 l/min

Dimensions a

mm

420

510

510

510

510

510

D

b

mm

410

510

510

510

510

510

h

mm

750

720

1030

1030

1190

1425

i

mm

300

k

mm

700

600

900

900

900

1100

l

mm

70

140

150

150

310

345

Table 1

0.45

0.52

0.66

0.77

0.92

1.05

Standby power