B. normal operation, C. manual activation, D. elt reset – ACR&Artex B406-4 User Manual

Page 32: E. functional check

Advertising
background image

ACR ELECTRONICS, INC / ARTEX PRODUCTS

DESCRIPTION, OPERATION, INSTALLATION AND MAINTENANCE MANUAL

B406-4 (453-5004)

25-62-03

Page 32 of 87

JUN 20/13

“ACTIVE” state requires a positive switch transition from either the cockpit remote switch, ELT

local switch, or G-switch.

NOTE: It is possible the G-switch could activate the ELT as the result of severe maneuvers

or a very hard landing.

(6)

To take the ELT from an “ACTIVE” state back to an “INACTIVE” state, a “RESET” must occur.

See SUBTASK 25-62-03-870-004.

(7)

A warning buzzer is required under C126 TSO approval. The buzzer is powered by the aircraft

battery.

SUBTASK 25-62-03-870-002

B. Normal Operation

(1)

The cockpit remote switch is in the “ARM” position (i.e., down).

(2)

The local switch on the ELT is in the “OFF” position (i.e., down).

SUBTASK 25-62-03-870-003

C. Manual Activation

(1)

The ELT may be manually activated by placing either switch in the “ON” position.

NOTE: As long as the cockpit remote switch and the ELT local switch are in the ARM/OFF

positions respectively, the ELT will automatically activate on impact.

SUBTASK 25-62-03-870-004

D. ELT Reset

(1)

If the ELT is activated accidently, it will need to be reset.

(2)

Reset the ELT from the cockpit by moving the remote switch to the “ON” position, waiting

approximately one second, and then moving it back to the “ARM” position. If the switch is

already in the “ON” position, move it to the “ARM” position.

(3)

Reset the ELT locally by moving the switch on the ELT to the “ON” position, waiting

approximately one second, and then moving it back to the “OFF” position. If the switch is

already in the “ON” position, move it to the “OFF” position.

NOTE: The ELT cannot be reset if either the cockpit remote switch or the ELT local switch is

in the “ON” position.

SUBTASK 25-62-03-750-001

E.

Functional Check

(1)

A monthly functional check is recommended to verify operational status of the ELT.

(2)

Perform this functional check in accordance with SUBTASK 25-62-03-750-011 on page 45.

Advertising