Section 4—packaging, handling, and set-up, Receiving unpacking, Unpacking the bed ends – Activeforever Invacare Semi-Electric Home Care Hospital Bed User Manual

Page 21: Receiving, Unpacking

Advertising
background image

SECTION 4—PACKAGING, HANDLING, AND SET-UP

Part No 1114836

21

IVC

Bed Series

SECTION 4—PACKAGING,
HANDLING, AND SET-UP

Receiving

1. Count cartons before signing shipping papers.

2. Designate someone at the facility to receive and inspect all merchandise. Use the

master order acknowledgment to check off items as they are received.

3. Compare the number of cartons shipped with the number of cartons actually received

and note such on the consignee copy of the freight bill. Make sure to have the truck
driver sign the copy acknowledging the count.

4. If shortage occurs, IMMEDIATELY contact Invacare Customer Service department.

Unpacking

NOTE: Check all parts for shipping damage. In case of shipping damage, DO NOT use. Contact
Dealer/Carrier for further instruction.

CAUTION

DO NOT plug the power cord into a power source until assembly is complete. To

do so could result in damage or personal injury.
DO NOT attempt to operate bed controls prior to completion of assembly, other-

wise damage to bed components may occur.

Unpacking the Bed Ends

NOTE: For this procedure, refer to
FIGURE 4.1.

5. Remove any loose packing from the

carton.

6. Bed End carton includes:

• Two Universal Bed Ends

• Four Casters (two locking and two

non-locking casters)

• One Drive Shaft Assembly in two

pieces

• One Hand Crank

FIGURE 4.1 Unpacking the Bed Ends

Carton

Hand

Crank

Drive

Shaft

Casters

Packaging

Bed

Ends

Advertising