Supply connections, Hose connections, Figure 3 – M&C TechGroup PSS-10_1 Operator's manual User Manual

Page 12: Medium connections

Advertising
background image

12

Gas sampling and gas conditioning technology

4-2.1.2-ME

12

SUPPLY CONNECTIONS

12.1

HOSE CONNECTIONS

N O T E !

Do not mix up the hose connections: they are clearly marked.

After all the hoses have been connected, the tightness of such
leads should be checked.



Figure 3 shows the possible medium connections. These are located in the right-hand side of the gas
conditioning case at the rear in a specially immersed assembly frame.

Power
supply

Sample gas
Out

Out

Condensate

In

Sample gas

Figure 3

Medium connections


All hose connections are equipped with 4/6mm sealing ring threaded hose couplings made of
polypropylene (PP) for gas input temperatures of up to a maximum of 80°C (see 3.). If heated sample
lines are used, whereby the gas input temperatures are increased up to a maximum of 180°C,
additional bulkhead unions made of stainless steel are recommended.

Connection hoses with dimensions DN 4/6mm are utilised for all models.

Advertising