Electrical connections – M&C TechGroup PSS-10_1 Operator's manual User Manual
Page 13

13
Gas sampling and gas conditioning technology
4-2.1.2-ME
The sample gas hoses, and condensation hoses, are to be assembled as follows:
Remove the union nut from the sealing ring couplings by turning it anti-clockwise. The nut should
be removed from the thread with great care so as to ensure that the loose sealing ring in the nut is
not lost.
Place the union nut over the connecting hose.
Place the sealing ring over the connecting hose with the thicker bead towards the nut.
Place the hose over the nipple on the thread.
N O T E !
The tightness of the connections can only be guaranteed if the
connecting hose has a straight rim (hose cutter).
The union nut is to be screwed tight by hand.
The hose will no longer be able to slip off, and is now compression-proof.
The hoses are to be removed in the reverse order.
W A R N I N G !
Aggressive condensate is possible.
Wear protective glasses and proper protective clothing!
12.2
ELECTRICAL CONNECTIONS
W A R N I N G !
False supply voltage can demage the equipment. When
connecting the equipment, please ensure that the supply voltage
is identical with the information provided on the model type
plate!
N O T E !
For the erection of power installations with rated voltages up to
1000V, the requirements of VDE 0100 and relevant standards and
specifications must be observed!
The main circuit is equipped with a fuse corresponding to the
nominal current (over current protection); for electrical details
see technical data.