Vutec LECTRIC IV - Installation Instructions User Manual

Page 7

Advertising
background image

6

04/21/08 Rev D

LIIe-INST_D

WIRING DIAGRAM - 120VAC

The screen may also be operated by optional IR/RF remote control, optional 12VDC trigger relay, optional Low

Voltage control or optional Home Automation control by AMX, Crestron, etc. Consult Vutec for further details.

FIRST OPERATION

CAUTION: THE FIRST C YCLE DOWN AND UP O F THE SC REEN MUST BE PERFO RMED UNDER C ONTROL OF AN ATTENDANT. THE

MOTOR LIMIT SWITCH ES MIGHT BE DISENGAGED DURING SHIPPING WH ICH WILL NOT STOP THE SCREEN

`AUTOMATICALLY AND MAY CAUSE DAMAGE TO THE SCREEN IF IT IS ALLOWED TO COME DOWN BELOW LEADER

REQUIREMENT.

Verify the leader requirem ent for the installation. Se nd the screen down and expect it to stop at

the leader

requirement. Stop if the screen appears to go up on the front side of the roller.
If the screen stopped at the leader requirement; send it back up to close the trap door which in turn trips the DCL

switch to stop the motor.
If the screen went below the leader requirem ent; stop! Send it back up half way , stop! Proceed to LOWER

LIMIT ADJUSTMENT Section for instructions.

CAUTION: THE MOTOR IS EQUIPPED WITH THERMAL OVERLOAD PROTECTION DEVI CE. OPERATING THE SCREEN WITHOUT

ALLOWING SUFFICIENT OFF TIME COULD RESULT IN THERMAL OVERLOAD SHUT DOWN. IF THIS OCCURS, SIMPL Y

ALLOW THE MOTOR TO COOL DOWN (APPROXIMATELY 15 MINUTES) BEFORE RESUMING NORMAL OPERATION.

Advertising