Banks Power Chevy_GMC Trucks: Duramax LB7 (Diesel ’01 - 04 6.6L) Tuner- Six-Gun Diesel Tuner with optional Speed-Loader Module '01-04 For use with Six-Gun Switch User Manual

Page 10

Advertising
background image

10

96446 v.4.0

and 10-pin connector are upright and
the TCC and single 8-pin connector are
facing downward.

10.

The Six-Gun is to be installed on

the outside of the left steering column
support bracket (see

Figure 3). Make

sure the outside of the column support
bracket is free of oil, grease and dirt.

11.

With the Six-Gun Diesel Tuner

positioned under the dash, just outside
the left steering column support
bracket, peel the protective backing
from the hook and loop interlocking
fastener attached to the Six-Gun Diesel

Tuner. With the Six-Gun Diesel Tuner’s
long outside edge parallel to the
support bracket, press the adhesive
onto the outside of the support
bracket (see

Figure 3). Apply light

pressure to the Six-Gun Diesel Tuner
by hand for 60-seconds to create a
strong bond between the bracket and
hook & loop interlocking fastener.
Using the supplied cable ties, secure
the wire harness under the dash away
from any pedals or moving
components.

-END, SECTION 2-

Advertising