Banks Power Twin-Turbo: Forced Induction- Twin Turbos Small Block Chevy User Manual
Page 26
26
96800 v.1.0
forward in the vehicle. Apply liquid
Teflon to a
1
⁄
8
" pipe plug and install it
in the
1
⁄
8
" port near the other front
stud hole. See
Figure 30.
13.
Install the pressure chamber over
the four studs and seat it against the
o-ring. Install the pressure chamber
cover over the four studs. No sealant
or gasket is used between the
pressure chamber and cover. Install
eleven,
5
⁄
16
-18 x
3
⁄
4
" button head bolts
and lightly snug the bolts. See
Figure
31.
14.
Install four
5
⁄
16
” thread seal
washers over the studs and push them
down until they contact the cover.
Install four
5
⁄
16
” AN washers and
5
⁄
16
”-
24 Nylock nuts on the studs and
torque evenly to 5-7 ft-lb. Now torque
the eleven cover bolts to 8-10 ft. lbs.
15.
Place one 2
1
⁄
2
” x
1
⁄
16
” o-ring into
the grove of each of the two 2-
1
⁄
2
”
hose nipples. Install the hose nipples
onto the front of the pressure
chamber using eight
1
⁄
4
-20 x
1
⁄
2
”
socket head cap screws. Torque to 5-7
ft-lbs. See
Figure 32.
16.
Check the operation of the
throttle lever on the throttle body to
ensure that the lever or installed
throttle cable or linkage cannot hit the
pressure chamber or other
components causing a stuck throttle
or run-away open throttle condition.
Take whatever actions are required to
provide necessary clearance. This may
require a modified lever or lever
extension.
-END, SECTION 7-
Figure 29