Banks Power Twin-Turbo: Forced Induction- Twin Turbos Small Block Chevy User Manual

Page 26

Advertising
background image

26

96800 v.1.0

forward in the vehicle. Apply liquid
Teflon to a

1

8

" pipe plug and install it

in the

1

8

" port near the other front

stud hole. See

Figure 30.

13.

Install the pressure chamber over

the four studs and seat it against the
o-ring. Install the pressure chamber
cover over the four studs. No sealant
or gasket is used between the
pressure chamber and cover. Install
eleven,

5

16

-18 x

3

4

" button head bolts

and lightly snug the bolts. See

Figure

31.

14.

Install four

5

16

” thread seal

washers over the studs and push them
down until they contact the cover.
Install four

5

16

” AN washers and

5

16

”-

24 Nylock nuts on the studs and
torque evenly to 5-7 ft-lb. Now torque
the eleven cover bolts to 8-10 ft. lbs.

15.

Place one 2

1

2

” x

1

16

” o-ring into

the grove of each of the two 2-

1

2

hose nipples. Install the hose nipples
onto the front of the pressure
chamber using eight

1

4

-20 x

1

2

socket head cap screws. Torque to 5-7
ft-lbs. See

Figure 32.

16.

Check the operation of the

throttle lever on the throttle body to
ensure that the lever or installed
throttle cable or linkage cannot hit the
pressure chamber or other
components causing a stuck throttle
or run-away open throttle condition.
Take whatever actions are required to
provide necessary clearance. This may
require a modified lever or lever
extension.

-END, SECTION 7-

Figure 29

Advertising