Banks Power Dodge Trucks: (Diesel ’98 - 02 5.9L Cummins ISB) Power Systems- Stinger & Git-Kit Systems (does not connect to pump wire) User Manual

Page 12

Advertising
background image

43.

Inside the cab, plug the main

8- and 10-pin connectors from the
wire loom into the OttoMind box. On
vehicle with automatic transmission,
plug the Tcc wire harness into the
OttoMind.

For Git-Kit installation,
proceed to Step

45.

44.

Route the thermocouple

leadwire through the grommet in
the firewall. connect the yellow
and red wires of the leadwire to the
corresponding connectors on the
thermocouple. Plug the remaining
end into the proper port on the
OttoMind.

If you have a 1998-2001 vehicle,
proceed to Step

45a

. If you have a

2002 vehicle, proceed to Step

45b.

45a.

For 1998-2001 vehicles,

locate the 10 gauge dark blue wire
on the wire harness running along
the right side of the steering column.
Install a yellow T-tap on this wire.
Plug the red OttoMind wire into this
T-tap. See Figure

8a

. Proceed to

Step

46.

45b.

For 2002 vehicles only,

remove the steering column lower
shroud by removing the 4 torx bolts.
check the ignition switch to see if
it has a 7-pin or 14-pin connector.
Refer to Figure

8b

for the 14-pin

ignition switch.

If your vehicle has a 7-pin ignition
switch, locate the 10 gauge dark
blue wire at the switch. Trace this
wire and install a yellow T-tap at the
location as shown in Figure

8a

. Plug

the red OttoMind wire into this T-tap.
Re-install the steering column lower

shroud. Proceed to Step

46

.

If your vehicle has a 14-pin ignition
switch, locate the 16 gauge dark blue
wire on the switch at Pin #3
See Figure

8b

.

do not use the 10 gauge dark
blue wire.
Trace this 16 gauge dark
blue wire and install a red T-tap at
the location as shown in Figure

8a

.

Plug the red OttoMind wire into this
T-tap. Re-install the steering column
lower shroud.

46.

Find the small bolt located at

the lower left hand corner as shown
in Figure

9

. Remove it and install the

Ottomind wire ring terminal at this
location. Reinstall the bolt to secure
the ring terminal.

47.

Reconnect battery terminals for

the remaining installation and test.
For Git-Kit installation, proceed to
CHECKING ENGINE PERFORMANCE
and complete Steps

56

through

58

at the end. For Stinger installation,
continue to Step

48

.

dYnaFact inStrumentation
inStallation

48.

choose a suitable location

under the lower edge of the dash
for the mounting of the instrument
panel provided where the driver can
conveniently view it.

Note: Molded pillar mount and
additional gauges are available
through Gale Banks Engineering.

49.

Using the panel as a template,

drill two 3⁄16” diameter holes in the
dash and mount the panel with the
supplied machine screws, nuts and
star washers provided.

50.

Locate the supplied gauge wire

harness with the 4-pin connector.
Plug the 4-pin connector into the
corresponding 4-pin receptacle from
the EconoMind wire harness. see
Figure 2.

51.

Install the DynaFact boost and

pyrometer gauges in the mounting
panel using the clamps and

Figure 9

12 |

9 6 7 6 5 v . 5 . 0

Advertising