Turbocharger installation, Big hoss installation 13 – Banks Power Dodge Trucks: (Diesel ’98 - 02 5.9L Cummins ISB) Tuner- Big Hoss Diesel Tuner (connects to pump wire) User Manual
Page 12
12
96759 v.4.0
TURBOCHARGER
INSTALLATION
Install the new turbine inlet gasket
provided and apply a dab of anti-seize
compound to the four turbo mounting
studs. Install the turbo-charger on the
exhaust manifold. As the turbocharger
is reinstalled, slip the oil drain tube
into the drain hose. Tighten the
turbocharger mounting nuts to 24
ft-lbs. Tighten the oil drain hose clamp.
12.
Reconnect and tighten the turbo
oil supply hose. Bolt the turbine outlet
pipe to the turbine outlet using the
original bolts.
BIG HOSS INSTALLATION
13.
For automatic transmission
models, locate and remove the rubber
plug mounted in the firewall slightly
above and to the right of the steering
shaft, as viewed facing the firewall
through the engine compartment.
Make a cross-shaped incision in the
plug and reinstall it in the firewall. See
Figure 4.
For manual transmission models, make
an incision in the main wiring loom
grommet above the wire bundle. Take
care to not cut any wiring. See Figure
4.
Figure 4