Banks Power Ford Trucks: (Diesel ’03 - 07 6.0L Power Stroke) Tuner- Six-Gun Diesel Tuner & SpeedBrake, For use with Banks iQ '03-07 Compatible with PowerPDA User Manual

Page 19

Advertising
background image

96825 v.6.0

19

Figure 17 Brake Pressure Sensor

6.

Disconnecting the RJ12 cable.

A) For installed PowerPDA:

Disconnect RJ12 from docking station.
B) For installed Banks iQ: Disconnect

RJ12 from bridge module.

7.

Remove the OBD II interface cable

from the vehicle.
Installing Banks SpeedBrake Wire

Harness

8.

From inside the engine

compartment, locate the factory

brake pressure sensor connector on

the brake master cylinder. The brake

pressure sensor will be the connector

farthest away from the firewall. See

Figure 17. Disconnect the factory

brake pressure sensor connector.

9.

Locate the Brake Pressure Sensor

harness in your kit. connect the

female connector on the Brake

Pressure Sensor harness to the factory

male connector. connect the male

connector on the Brake Pressure

Sensor harness to the factory female

connector.

10.

Route the 2-pin connector on

the Brake Pressure Sensor harness

following the Six-Gun/EconoMind

in-cab cable through the fire wall.

Secure the wiring harness with the

supplied cable ties away from any heat

source or moving parts.

11.

From under the dash, pull the

2-pin connector on the Brake Pressure

Sensor harness through the fire wall.

12.

Locate the Banks SpeedBrake

Wire Harness and connect the 2-pin

male connector on the Brake Pressure

Sensor harness to the 2-pin connector

on the Banks SpeedBrake wire

harness.

13.

connect the Banks SpeedBrake

Wire Harness OBD II connector to the

vehicle’s OBD II connector. Use a cable

tie, as shown in Figure 18 to secure

the Banks SpeedBrake Wire Harness to

the vehicle’s OBD II connector.

14.

Locate the Fuse connector on the

Banks SpeedBrake Wire Harness and

connect it to the mini-fuse blade tap

location #22. Replace the fuse cover

and make sure not to pinch the Fuse

wire.

Advertising