12.
a. If the banks power
elbow was installed, torque
the two (2)
7
⁄
16
” turbine
outlet pipe attach bolts to
15 ft-lbs. NOTE: Do not use
an impact wrench on these
fasteners. The wide span of
the two-bolt spherical flange
creates sufficient clamping
force when 15 ft-lbs is
used. Exceeding this torque
specification will not increase
the sealing performance.
b. If the factory turbine outlet
elbow was utilized, torque
the turbine outlet pipe attach
bolts to
23
ft-lbs.
13.
starting from the front
of the exhaust system and
working back, evenly torque
each of the nuts on the
exhaust clamps to 35 ft-lbs.
Make sure that each slip joint
is fully inserted (±
1
⁄
4
inch), and
that all frame mount hangers
are hanging in the forward
position. see Figures
3
and
4
.
14.
lower the vehicle.
15.
remove protective
covering from tailpipe tip.
CAUTION: Failure to
remove protective
covering from tailpipe
tip may lead to severe
personal injury or damage
to the vehicle. The
protective covering may
ignite and burn if not
removed prior to running
the engine.
16.
re-connect battery
terminals if previously
removed.
17.
Monster exhaust system
installation is now complete.