48

ELECTRICAL POWER SUPPLY

Autoflow to Fill System Control Box Interconnect

The Fill System Control Box houses the
starter (s) for the fill system(s) that load grain
into the Top Dry Autoflow Unit and for the
aeration fan. DO NOT run the control wires for
the Fill System Control Box in the same conduit
used for the power wires for the fill system and
aeration fan motors. To wire the Fill System
Control to the Autoflow Control Box do the
following.

1)

Run ten (10) control wires from the
Autoflow Control Box to the Fill System
Control Box.

2)

Connect the wires as shown in figure 24.

Figure 24