Attaching the A-Frame to the Eave Bracket
Assemble the lower portion of the A-frame rafters to the sidewalls.
1. Lower the A-frame rafter assembly (A) along the side of the eave bracket (C), and align with the
proper holes.
NOTE: Use the alignment hole (E) in the rafter to help align the holes with a punch tool.
2. Install flange bolts (B) and flange nuts (D), securing one side on the A-frame assembly.
3. Repeat this procedure for the other side of the A-frame.
4. Tighten to the recommended torque specifications. See
Bolt Torque Specifications, page 28
.