Assembling purlin number 4, Chapter 7: roof assembly – Grain Systems Tanks PNEG-4054G User Manual

Page 90

Advertising
background image

Chapter 7: Roof Assembly

Figure 7-11 Purlin location 5

A

Left-hand roof rafter (CTR-0481 and CTR-0488)

G

7/16 in. flange nut (S-10251)

B

7/16 x 1-1/4 in. flange bolt (S-10250)

H

Purlin (CTR-0515)

C

Right-hand roof rafter (CTR-0481 and CTR-0488)

I

7/16 in. flange nut (S-10251)

D

Upper right purlin clip (CTR-0614)

J

Lower left purlin clip (CTR-0611)

E

Upper left purlin clip (CTR-0613)

K

Lower right purlin clip (CTR-0612)

F

7/16 x 1-1/4 in. flange bolt (S-10250)

Assembling Purlin Number 4

Purlin number 4 is located fourth from the eave.

Before You Begin

Place two roof rafters on the ground with roof panel holes facing up. Several A-frame assemblies will have
X-bracing installed and be placed periodically throughout the perimeter of the roof. Determine if X-bracing
is being installed and note those steps in this procedure.

What You Should Know

90

Pneg-4054G 54 Ft Diameter 40-Series Bin