For reco, Fuel connection – Grain Systems PNEG-338 User Manual

Page 20

Advertising
background image

8. Fuel Connection

20

PNEG-338 Portable Dryer Installation and Towing

Fuel System Specifications and Recommendations (N) Natural Gas

Figure 8C The fuel connection point is equipped with a

Y-strainer and Maxon safety valve.

Dryer

Model #

Maximum Heat

Capacity BTU Per Hour

Maximum Fuel Flow

Cubic Feet Per Hour

Fuel Line Size* (Dia.)

Heater Orifice Drill Size

1108

3,000,000

3,000

1-1/4''

3/8''

1110

3,500,000

3,500

1-1/4''

13/32''

1112

4,500,000

4,500

1-1/2''

1/2''

1114

5,750,000

5,750

1-1/2'' 33/64''

1116

5,750,000

5,750

1-1/2''

33/64''

1118

6,750,000

6,750

2'' 35/64''

1120

7,500,000

7,500

2''

37/64''

1122

8,750,000

8,750

2'' 19/32''

1126

10,250,000

10,250

2''

41/64''

1214

6,200,000

6,200

1-1/2'' (1)13/32''

(1)5/16''

1216

7,200,000

7,200

2''

(1)1/2'' (1)5/16''

1218

7,200,000

7,200

2'' (1)1/2''

(1)5/16''

1220

8,500,000

8,500

2''

(1)33/64'' (1)3/8''

1222

9,750,000

9,750

2'' (1)35/64''

(1)3/8''

1226

10,500,000

10,500

2''

(1)37/64'' (1)3/8''

1214S

6,000,000

6,000

1-1/2'' (2)3/8''

1218S

6,000,000

6.000

1-1/2''

(2)13/32''

1220S

9,000,000

9,000

2'' (2)1/2''

1222S

9,000,000

9,000

2''

(2)1/2''

1226S

13,500,000

13,500

2'' (2)17/32''

1314

8,100,000

8,100

2''

(3)5/16''

1318

8,100,000

8,100

2'' (3)5/16''

1322

8,100,000

8,100

2''

(3)5/16''

160AB

3,000,000

3,000

1-1/4'' 3/8''

210AB

3,500,000

3,500

1-1/4''

13/32''

300AB

4.500,000

4,500

1-1/2'' 1/2''

375AB

5,500,000

5,500

1-1/2''

33/64''

400AB

5,500,000

5,500

1-1/2'' 33/64''

415AB

7,000,000

7,000

2''

(2)13/32''

600AB

9,000,000

9,000

2'' (2)1/2''

* The minimum size of the fuel line for distances of 30.48 m (100 ft.).

Advertising