72' temperature cable support assembly – Grain Systems Bin Accessories PNEG-1840 User Manual

Page 13

Advertising
background image

4. 60'-105' Bin Manager Temperature Cable Bracket Instructions

PNEG-1840 60'-105' Bin Manager Temperature Cable Support Bracket Instructions

13

72' Temperature Cable Support Assembly

Figure 4B

Installation instructions: Attach left and right bracket assemblies to roof beams as shown in detail 4

on Page 14

.

Adjust bracket position along the roof beam to the desired radius. Tighten all 1/2" bolts to a minimum torque of 120 ft. lbs.

Left bracket assembly
(See detail 4

on Page 14

.)

Right bracket assembly
(See detail 4

on Page 14

.)

Advertising