78' temperature cable support assembly – Grain Systems Bin Accessories PNEG-1840 User Manual
Page 21
Advertising
4. 60'-105' Bin Manager Temperature Cable Bracket Instructions
PNEG-1840 60'-105' Bin Manager Temperature Cable Support Bracket Instructions
21
78' Temperature Cable Support Assembly
Figure 4J
Installation instructions: Attach left and right bracket assemblies to roof beams as shown in detail 16
Adjust bracket position along the roof beam to the desired radius. Attach support channel to the left and right bracket
assemblies with 3/8" x 1-1/2" flange head bolts, washers and nuts. Attach hanging bracket to the support channel with
3/8" x 1-1/2" flange head bolts, washers and nuts. Tighten all 1/2" bolts to a minimum torque of 120 ft. lbs.
Left bracket assembly
(See detail 16
.)
Right bracket assembly
(See detail 16
.)
Advertising