4. 60'-105' Bin Manager Temperature Cable Bracket Instructions
PNEG-1840 60'-105' Bin Manager Temperature Cable Support Bracket Instructions
25
90' Temperature Cable Support Assembly
Figure 4N
Installation instructions: Attach left and right bracket assemblies to roof beams as shown in detail 22
.
Adjust bracket position along the roof beam to the desired radius. Attach support channel to the left and right bracket
assemblies with 3/8" x 1-1/2" flange head bolts, washers and nuts. Attach hanging bracket to the support channel with
3/8" x 1-1/2" flange head bolts, washers and nuts. Tighten all 1/2" bolts to a minimum torque of 120 ft. lbs.
Left bracket assembly
(See detail 22
.)
Right bracket assembly
(See detail 22
.)