4. 60'-105' Bin Manager Temperature Cable Bracket Instructions

PNEG-1840 60'-105' Bin Manager Temperature Cable Support Bracket Instructions

25

90' Temperature Cable Support Assembly

Figure 4N

Installation instructions: Attach left and right bracket assemblies to roof beams as shown in detail 22

on Page 26

.

Adjust bracket position along the roof beam to the desired radius. Attach support channel to the left and right bracket
assemblies with 3/8" x 1-1/2" flange head bolts, washers and nuts. Attach hanging bracket to the support channel with
3/8" x 1-1/2" flange head bolts, washers and nuts. Tighten all 1/2" bolts to a minimum torque of 120 ft. lbs.

Left bracket assembly
(See detail 22

on Page 26

.)

Right bracket assembly
(See detail 22

on Page 26

.)