Assembling purlin number 6, Chapter 7: roof assembly – Grain Systems Tanks PNEG-4105A User Manual

Page 92

Advertising
background image

Chapter 7: Roof Assembly

Figure 7-14 Purlin location 7

A

Left-hand roof rafter (CTR-0446)

F

1/2 x 1-3/4 in. flange bolt (S-10252)

B

1/2 x 1-3/4 in. flange bolt (S-10252)

G

1/2 in. flange nut (S-10253)

C

Right-hand roof rafter (CTR-0446)

H

Purlin (CTR-0453)

D

Right purlin clip (CTR-0100)

I

1/2 in. flange nut (S-10253)

E

Left purlin clip (CTR-0099)

Assembling Purlin Number 6

Purlin number 6 is located sixth purlin from the eave.

Before You Begin

Place two roof rafters on the ground with roof panel holes facing up. Several A-frame assemblies will have
X-bracing installed and be placed periodically throughout the perimeter of the roof. Determine if X-bracing
is being installed and note those steps in this procedure.

92

Pneg-4105A 105 Ft Diameter 40-Series Bin