Roof assembly instructions, Chapter 13 roof assembly instructions, 33' and 36' flat top instructions – Grain Systems Tanks PNEG-4036 User Manual
Page 89
PNEG-4036 40 Series 33' and 36' Diameter Bins
89
13. Roof Assembly Instructions
33' and 36' Flat Top Instructions
Figure 13A
Ref #
Part #
Description
Ref #
Part #
Description
A
“A” Diameter: Small = 61-1/4" (155.6 cm)
F
CRP-4964
Hold-Down Strap
B
Platform Flashing
G
5/16" Washer (Both ends)
C
CRP-4966
Small Roof Peak Platform Weldment
H
5/16" x 1-1/4" Bin Bolt
(Both ends of strap.)
D
S-7229
1/4" x 1" Sealing/Self-Drilling Tek Screw
I
Apply a bead of rope
caulking under flashing.
E
CRP-4968
Platform Bulb Seal Strip
NOTE: On 33' (10.06 m) and 36' (10.98 m) roofs,
the roof nose bolt cannot be shared with the platform
hold-down strap. Locate six (6) equally spaced bolts
in the bottom row of the 6' (1.83 m) “Z” collar to
accept this strap on these roofs. Double nut the
six (6) bolt locations as shown in
.