Fcl (4.00" corr.) side draw – Grain Systems Bin Accessories PNEG-066 User Manual
Page 15
Advertising
15
PNEG-066 2.66" & 4.00" Side Draw Installation
4.00" Side Draw Systems
FOUNDATION
1
10
9
8
7
6
5
4
3
2
11
NUMBER OF
RINGS IN
T
ANK
VIEWED FROM INSIDE TANK
DETAIL "B"
STIFFENERS
44" TYPICAL
WIND RING INSTALLATION
Installation of side draw systems on some 4.00" Corrugation
tanks require additional wind rings.
NOTE: Unloading tube and support from rack and pinion are
not provided by G.S.I
12
13
17'-2"
12-3/4"
15"
14"
8"
STARTING
DIMENSION
FOR FIRST
CHUTE
SEE DETAIL "D"
1st BOLT HOLE IN
TOP CHUTE
REQUIRED
SPACING
BETWEEN CHUTE
BOLT HOLES
5th HORIZONTAL
SEAM FROM
BASE
FCL (4.00" CORR.) SIDE DRAW
FCL (4.00" CORR.) SIDE DRAW
FCL (4.00" CORR.) SIDE DRAW
FCL (4.00" CORR.) SIDE DRAW
FCL (4.00" CORR.) SIDE DRAW
INSTRUCTIONS
INSTRUCTIONS
INSTRUCTIONS
INSTRUCTIONS
INSTRUCTIONS
Advertising