Fcl (4.00" corr.) side draw – Grain Systems Bin Accessories PNEG-066 User Manual

Page 15

Advertising
background image

15

PNEG-066 2.66" & 4.00" Side Draw Installation

4.00" Side Draw Systems

FOUNDATION

1

10

9

8

7

6

5

4

3

2

11

NUMBER OF

RINGS IN

T

ANK

VIEWED FROM INSIDE TANK

DETAIL "B"

STIFFENERS

44" TYPICAL

WIND RING INSTALLATION

Installation of side draw systems on some 4.00" Corrugation
tanks require additional wind rings.

NOTE: Unloading tube and support from rack and pinion are
not provided by G.S.I

12

13

17'-2"

12-3/4"

15"

14"

8"

STARTING
DIMENSION
FOR FIRST
CHUTE

SEE DETAIL "D"

1st BOLT HOLE IN
TOP CHUTE

REQUIRED
SPACING
BETWEEN CHUTE
BOLT HOLES

5th HORIZONTAL
SEAM FROM
BASE

FCL (4.00" CORR.) SIDE DRAW

FCL (4.00" CORR.) SIDE DRAW

FCL (4.00" CORR.) SIDE DRAW

FCL (4.00" CORR.) SIDE DRAW

FCL (4.00" CORR.) SIDE DRAW

INSTRUCTIONS

INSTRUCTIONS

INSTRUCTIONS

INSTRUCTIONS

INSTRUCTIONS

Advertising