15'-24' hopper assembly – Grain Systems Tanks PNEG-1070 User Manual

Page 35

Advertising
background image

5. 15'-24' Hopper Assembly

PNEG-1070 15', 18', 21', 24', 27' and 30' CHT’s

35

Begin assembling the hopper bottom by attaching a right and left pair or pairs of hopper panels to the
compression angle ring (3/8" x 1" bin bolt (S-455)) and discharge collar (1/2" x 1" hardware (S-4492)) at
four (4) opposing points as shown in

Figure 5D

. Caulking is required on the vertical seams of the lapped

hopper panels (Refer to

Figure 5G

). Splice plates which join the compression angle segments on the

back side may be installed following a pair of hopper panels. Refer to

Figure 5F

. Complete this assembly

by laying in alternate right and left panels moving around in one direction and lapping all sheets the
same way,

See Figure 5E

. Do not tighten bolts until all hopper panels are attached to each other, the

compression angle, splice plates and discharge collar.

On 15' through 24' tanks use 1/2" bolts on hopper seams.

NOTE: All bolts used in hopper assembly should be installed with the bolt heads to the inside of

the hopper.

Figure 5D Hopper Panel and Discharge

Collar Assembly

Figure 5E Lap Detail (Viewed from Inside of Bin)

Figure 5F Hopper Panel Detail

Figure 5G Caulking Detail

Figure 5H

Start at the bottom of the hopper and tighten all bolts, including anchor bolts, discharge collar, hopper
panels, splice plates and compression angle segments.

Detail B

Detail A

Advertising