Hopper assembly, Chapter 12 hopper assembly, Hopper sheets – Grain Systems Tanks PNEG-1460 User Manual

Page 61

Advertising
background image

PNEG-1460 6', 7' and 9' Bulk Feed Tank BFT Series and GHT Series

61

12. Hopper Assembly

Hopper Sheets

When starting to attach hopper sheets to sidewall it is recommend that the first hopper sheet seam be
positioned halfway between leg positions. Lap the hopper sheets as shown in

Figure 12B on Page 62

.

Apply two (2) strips of caulking on all seams at sidewall to hopper and hopper sheet to hopper sheet. Be
sure to place the head of the truss bolt on the inside of hopper. Leave one hopper sheet out to allow room
to install hopper collar. Be sure to use two (2) strips of caulking between hopper collar and hopper sheets,
then put last hopper sheet in place.

Figure 12A

Ref #

Description

A

Hopper Reinforcement Angle

WARNING

All 9' diameter 60° 3-6 ring and 7' diameter 67° 5 and 6 ring tanks require hopper
reinforcement angles. Angle covers entire seam (including hopper collar).

NOTE:

When used for 22" (559 mm) hopper

openings, field cut brace below slot to fit properly.

Advertising