5

Series 2000 Downwind Heater

TABLE OF CONTENTS

Safety

6

Series 2000 Heater Installation

High Temperature Heater Specifications

8

Low Temperature Heater Specifications

8

Temperature Sensor Box

9

Transition Hi-Limit Installation

9

Bin Configuration/Operating Temperature Table

10

Heater Unit Wiring

11

Secondary Heater Unit Wiring

11

Machine To Earth Ground

12

Proper Installation Of The Ground Rod

12

Previously Installed Units

12

Fuel Connection For Liquid Propane Models

13

Fuel Connection For Propane Vapor Models

13

Fuel Connection For Natural Gas Models

13

Installing Optional Humidity Sensor

14

Series 2000 Operating Procedure

Power Up

15

Normal Operating Displays With Heater Not Running

16

Starting The Dryer

17

Setting Gas Pressure

17

BTU's Per Gauge Pressure (PSI) 10-15 hp Models (Approximate)

19

BTU's Per Gauge Pressure (PSI) 20-40 hp Models (Approximate)

20

BTU's Per Gauge Pressure (PSI) Lo-temp Models (Approximate)

22

Adjusting The Vaporizer

23

Running The Dryer

23

Programming Set Points

24

Programming Hours To Shutdown

25

Drying Grain In The Hours To Shutdown Mode

25

Run Hours Display

25

Multiple Heater Notes

25

Modulating Valve Operation

26

Factory Configuration

Configuration Dip Switches

27

Error Conditions

Limit Switches

28

Multiple Heater Error Conditions

28

Misc Error Numbers

28

Series 2000 Heater Service

29

Series 2000 Wiring Diagram

30

Warranty

32