Heater installation, Transition hi-limit installation – Grain Systems PNEG-824 User Manual

Page 9

Advertising
background image

9

Series 2000 Downwind Heater

HEATER INSTALLATION

PLENUM TEMPERATURE

SENSOR MOUNTING

The plenum temperature sensor is
the white PVC junction box with bolt
extending from outside attached by
a cord to the fan/heater control box.

1. 24" to the right side of the transi

tion, drill one 3/8" hole in the cen
ter of the plenum in a valley on
the bin sidewall.

2. Insert the probe through the hole.

3. Position the housing so that the

tabs are vertical, and the cord
exits the housing horizontally.

4. Use two self drilling screws to

mount the housing to the bin
sidewall.

5. Caulk between the housing and

the sidewall to seal.

Plenum temperature sensor installation.

1. Mark location on transition one

(1) foot up from the bottom
(entrance collar) and centered
in the transition.

2. Drill or knock out 7/8" diameter

hole on marked location.

3. Install transition hi-limit using

supplied self drilling screws.

TRANSITION HI-LIMIT INSTALLATION

Figure 1: The transition connecting the heater to the bin with the plenum

thermostat in place.

Advertising