Installation, Transition hi-limit installation, Plenum thermostat mounting – Grain Systems PNEG-588 User Manual

Page 9

Advertising
background image

9

Deluxe Centrifugal Heater

1. Mark location on transition one

(1) foot up from the bottom
(entrance collar) and centered
in the transition.

2. Drill or knock out 7/8" diameter

hole on marked location.

3. Install transition hi-limit using

supplied self drilling screws.

Transition Hi-limit Installation

Figure 3: The transition connecting the heater to the bin with the plenum

thermostat in place.

INSTALLATION

Plenum Thermostat

Mounting

The plenum thermostat is the 4 x 4
white box with knob that is
preconnected to heater when heater
is ordered with thermostat.

1. 24" to the right side of the transi-

tion, drill one

3

/

8

" hole (high

temp) or 1

1

/

2

" hole (low temp)

in the center of the plenum in a
valley (4.00" corrugation) or hill
(2.66" corrugation) on bin
sidewall.

2. Insert the probe through the hole.

3. Position the housing so that the

tabs are vertical, and the cord
exits the housing horizontally.

Plenum thermostat mounting on bin wall.

5. Caulk between the housing and the sidewall to seal.

4. Use 4 self drilling screws to mount the housing to the bin sidewall.

Advertising