66'' corrugated farm bin – Grain Systems Bin Accessories PNEG-1652 User Manual
Page 13
Advertising
![background image](/manuals/277790/13/background.png)
3. Inside Ladder Instructions
PNEG-1652 Reinforced Inside Ladder Instructions
13
2.66'' Corrugated Farm Bin
Figure 3E Inside Starter Bracket and Ladder Placement
NOTE: Be sure to push ladder sections up and tighten. Do not tighten ladder section splices with ladder
sections hanging under their own weight.
Now all standoff brackets and straps must be installed every 32" and attached to each 4' section required.
Figure 3F Un-Assembled Reinforcing Strap
Figure 3G Assembled Reinforcing Strap
Advertising