Sidedraw system installation (continued), Sidewall overlap, Caulking – Grain Systems Tanks PNEG-2400 User Manual
Page 78
Advertising

7. Sidedraw Accessory Instructions
78
PNEG-2400 CFL Commercial Farm 4" Corrugation Externally Stiffened Grain Bin
Sidedraw System Installation (Continued)
Sidewall Overlap
1. For proper watershed, make sure that the upper side sheet overlaps on top of the sidedraw
weldment.
Figure 7F
Caulking
1. To seal the sidedraw weldment to the sidewall sheets use: two (2) beads of caulking, one bead of caulk
on each side of the outside row of vertical bolts. Use discharge tube weldment as a template to field
drill the bolt holes through sidewall sheet. Use 3/8" bolts and nuts provided to bolt sheets together.
Use supplemental caulk as necessary for sealing purposes.
Figure 7G
Figure 7H
Advertising