Grain Systems Bin Accessories PNEG-1846 User Manual

Page 13

Advertising
background image

3. 105' Diameter Eave Walk Around Package

PNEG-1846 “X” Series Complete 105' Walk Around Manual

13

4. Attach handrail and mid strap to the handrail posts. Make sure the head of the bolt is to the inside of

the platform. Do not tighten bolts until installation is complete to ensure proper fit. The handrails and
mid straps will overlap at each post and should be installed counterclockwise to cover the handrail
tab.

(See Figure 3D.)

Figure 3D

Advertising