Grain Systems Bucket Elevtors, Conveyors, Series II Sweeps PNOT-454 User Manual

Product notification, Pnot‐454

Advertising
background image

 

 

PRODUCT NOTIFICATION

PNOT‐454

GSI GROUP • 1004 E. Illinois St. • Assumption, IL 62510 USA • 888‐GSI‐BINS • Fax: 800‐800‐5329 

Page 1 of 15 

Date: 9‐15‐11 

MODELS: 6 x 6 Distributor Platforms  

Platform Clamps 
 

This assembly is designed to be located at any elevation on trunking that is needed to provide access to 
other equipment. Determine elevation of platform surface and work from there. Locate all parts required 
for assembly by using the chart as shown 

in Figure 1

 
Locate all clamp halves (DSP36007), clamp brackets (DSP36016), threaded rods (DSP36008) and 
hardware to assemble clamps onto the trunking. Measure the distance between the clamps to assure 
proper location for support channels and knee brace attachment. See clamp detail 

in Figure 1 

for hardware 

orientation. Attach one clamp half to the end of each platform support channel using 5/8" hardware 
in the top and bottom holes of the bracket. Insert rod through the middle hole in the brackets attached 
to the platform support channel. Fasten using 5/8" nut, 5/8" lock washer and two (2) flat washers. Place 
brackets with support channels attached around trunking and fasten in place with clamp bracket using 
1/2" hardware. Adjust the position of the inside nuts of the rod assembly to allow the clamps to be 
tightened onto the trunking. 
 
NOTE: Tighten clamps onto trunking, do not overtighten and collapse the trunking. Position inside nuts 
back to the clamp and tighten.

 

 

 

Figure 1 

Advertising