Grain Systems Bin Accessories PNEG-1614 User Manual

Page 12

Advertising
background image

2. Installation

12

PNEG-1614 Heavy Duty Bin Stairs and Platform Assembly for 2.66" Corrugated Bin

2.

Figure 2I

shows the assembly of the stair bracing. As shown before in

Figure 2C on Page 8

, the first

vertical wall bracket will be located two (2) bolt spaces or 18-3/4" around the bin. 3/8" Hardware is
used at the four (4) connection points as shown. The outer two (2) mounting holes on the side and
the outer middle hole on the top of the horizontal wall bracket will be used to attach the step as shown
in

Figure 2J

.

Figure 2I Stair Bracing Inside View

Figure 2J Stair Bracing Outside View

Advertising