7 single phase power connections – R&M Materials Handling ELECTRIC CHAIN HOISTS LoadMate Chain Hoist LM 1 User Manual

Page 13

Advertising
background image

LM01 I&M MANUAL/EN/11.30.2010


13/65

This document and the information contained herein, is the exclusive property of R&M MATERIALS HANDLING, INC. and represents a non-public, confidential and proprietary trade secret
that may not be reproduced, disclosed to third parties, altered or otherwise employed in any manner whatsoever without the express written consent of R&M MATERIALS HANDLING, INC.
Copyright © (2010) R&M MATERIALS HANDLING, INC. All rights reserved.

2.7

Single Phase Power Connections

Figure 3. Single Phase Control Box Power Connections





1. Remove control box cover.
2. Insert power supply cable through power cable gland (Figure 3
).
3. Connect power leads L1 and L2 to terminal strip (Figure 3
).
4. Connect ground wire PE to terminal strip (Figure 3
). Refer to wiring diagram.
5. Insure terminals are tight
6. Tighten cable gland or connector (Figure 3
) to secure power cable.
7. Replace control box cover.
8. Attach pushbutton assembly to plug (Figure 3
).








PE

L1

L2

POWER

CABLE

GLAND

PUSHBUTTON

PLUG

Advertising