5 fall stop assembly, 1 general, 2 fall stop installation – R&M Materials Handling ELECTRIC CHAIN HOISTS LoadMate Chain Hoist LM 1 User Manual

Page 28

Advertising
background image

LM01 I&M MANUAL/EN/11.30.2010


28/65

This document and the information contained herein, is the exclusive property of R&M MATERIALS HANDLING, INC. and represents a non-public, confidential and proprietary trade secret
that may not be reproduced, disclosed to third parties, altered or otherwise employed in any manner whatsoever without the express written consent of R&M MATERIALS HANDLING, INC.
Copyright © (2010) R&M MATERIALS HANDLING, INC. All rights reserved.

5.5

Fall Stop Assembly

5.5.1 General

The slack fall stop is a safety stop, not a functional stop. The fall stop must be located at least six
(6.0) inches [150mm] from end of last chain link.

Figure 8. Cross Section of Slack Fall Stop

5.5.2 Fall Stop Installation

1. Position two fall stop halves (item 1, Figure 8) on chain link at least six (6.0”) inches [150mm] from

end of load chain.


2. Insert screw (item 2) through fall stop halves and chain link.

3. Tighten nut (item 3) per torque setting in section 6.4.


Advertising