5 installing the load chain – R&M Materials Handling ELECTRIC CHAIN HOISTS LoadMate Chain Hoist LM 1 User Manual

Page 26

Advertising
background image

LM01 I&M MANUAL/EN/11.30.2010


26/65

This document and the information contained herein, is the exclusive property of R&M MATERIALS HANDLING, INC. and represents a non-public, confidential and proprietary trade secret
that may not be reproduced, disclosed to third parties, altered or otherwise employed in any manner whatsoever without the express written consent of R&M MATERIALS HANDLING, INC.
Copyright © (2010) R&M MATERIALS HANDLING, INC. All rights reserved.

5.4.5 Installing the Load Chain

Figure 7. Chain Installation

Figure 7-A. Chain Orientation


1-FALL CHAIN INSTALLATION


1. Attach last link of chain onto hook of CHAIN INSERTION TOOL (item 1, Figure 7).
2. If the insertion tool is not in the hoist (removal procedure), insert other end of CHAIN INSERTION TOOL

into chain opening closest to chain container side.


m

CAUTION: Make sure the chain weld on chain link faces inward toward chain wheel
pocket on hoist load sprocket. See Figure 7-A.


3. Run hoist “DOWN” in slow speed to feed chain through chain sprocket and out other side.
4. Attach fall stop at least 6.0 inches [150 mm] from end of chain (chain container side). Attach load block

assembly on other end of load chain. Refer to Figure 8 for details.

5. Make sure that load chain is not twisted or deformed.
6. Attach chain container.

Advertising