Warning, Vanity top installation — cabinet mount, Installation procedure – Swanstone WB-2218 - Installation User Manual

Page 7

Advertising
background image

1.

If necessary, identify the location of additional holes for the
faucet or other accessories and drill a 1/4” pilot hole from
the back side of the sink.

To prevent damage to the unit, do not use an auger style drill
bit.

B

Brre

ea

atth

hiin

ng

g H

Ha

az

za

arrd

d

When cutting or drilling the Swanstone
product, use a dust collection method

which prevents dust particles from going into the air.
Always work in a well-ventilated area. To keep the area well
ventilated, open windows and use exhaust fans. Always
use an OSHA approved dust mask when cutting, drilling, or
sanding Swanstone products.

2.

Drill fixture hole(s), using the 1/4” pilot hole for a guide,
with a 1-3/8” hole saw.

3.

Faucet may be installed at this time per manufacturer’s
instructions.

Vanity Top Installation — Cabinet Mount

1.

Install cabinet per manufacturer’s instructions.

Note: Make sure cabinet is level before installing vanity top.

VI-005

VI-009

VI-008

WARNING

VI-003

IMPORTANT NOTICE

VI-002

800-325-7008

7

The Swan Corporation – Swanstone

Installation Procedure

Advertising