Galaxy Power System Verification Procedures
2 - 2 Galaxy SC Controller Performance Verification Procedures
Issue 3 January 2008
Illustrations
Refer to Figures 2-1 and 2-2 for illustrations of the Galaxy SC
Controller.
SC Controller
Figure 2-1: Location of Galaxy SC Controller Circuit Boards
BJE Alarm Board
BJF Termination
Fuse Board
Rear View
BJA Independent Power Board
BJC Rectifier Interface Board
BJB Independent Controller
BJH Intelligent Controller
BJL Modem Board
BJJ Intelligent
Power Board
P500
TB1
Regulation
Fuses
Options
Slot 4
Options
Slot 3
Options
Slot 2
Options
Slot 5
Local PC
Port - RS232
Aux Port
Modem
BJT Termination Board