Galaxy Power System Verification Procedures

2 - 2 Galaxy SC Controller Performance Verification Procedures

Issue 3 January 2008

Illustrations

Refer to Figures 2-1 and 2-2 for illustrations of the Galaxy SC
Controller.

SC Controller

Figure 2-1: Location of Galaxy SC Controller Circuit Boards

BJE Alarm Board

BJF Termination

Fuse Board

Rear View

BJA Independent Power Board

BJC Rectifier Interface Board

BJB Independent Controller

BJH Intelligent Controller

BJL Modem Board

BJJ Intelligent
Power Board

P500

TB1

Regulation
Fuses

Options

Slot 4

Options

Slot 3

Options

Slot 2

Options

Slot 5

Local PC
Port - RS232

Aux Port

Modem

BJT Termination Board

Option