Galaxy Power System Verification Procedures

2 - 14 Galaxy SC Controller Performance Verification Procedures

Issue 3 January 2008

High Float Voltage Alarm/High Voltage Shutdown Alarm
Tests, continued)

HVSD Test

Procedure for

Serial Rectifiers,

continued

Step

Action

7

Observe the following:

•

When the voltage increases to the HV (FLOAT) level the
rectifier shuts down.

•

The Green ON LED on the rectifier blinks, the ALM
LED on the rectifier is not lit.

•

After 5-6 seconds the rectifier initiates its own restart
signal again, raising the plant voltage.

•

The rectifier will shutdown and restart three additional
times.

•

Upon the fourth shutdown, the rectifier's ALM LED
lights and the rectifier's display indicates “HO.”

•

The controller receives the RFA signal from the rectifier
and initiates a restart signal 5-6 seconds later.

•

The rectifier restarts again, raising plant voltage.

•

The rectifier shuts down and restarts four additional
times.

•

During these shutdowns the Green ON LED on the
rectifier blinks, the ALM LED on the rectifier is not lit.

•

Upon the fourth shutdown, the rectifier's ALM LED
lights and the rectifier’s display indicates “HO.”

•

An external RFA office alarm is generated.

Continued on next page.