Battery discharge test, continued – GE Industrial Solutions Galaxy Verification User Manual
Page 43
Advertising
Galaxy Power System Verification Procedures
Issue 3 January 2008
Galaxy SC Controller Performance Verification Procedures 2 - 31
Battery Discharge Test, continued
Test Completion
The test is completed when approximately 20 percent of anticipated
battery capacity is depleted.
At the completion of the test, BD and VLV alarm thresholds continue to
be inhibited for 3 additional minutes to allow the batteries to recharge.
A successful test displays the calculated value in the Reserve Time field;
default menu in the intelligent controller or menu path MENU
→
MAINT OPER.. in the basic controller. Reserve time in EasyView is
displayed at menu path: STATUS
→ DC PLANT.
Advertising