3 installation, 1 transport – GE Industrial Solutions LP 33 Series 30 & 40 kVA Installation Guide User Manual
Page 11
Modifications reserved
Page 11/41
OPM_LPS_3UI_30K_40K_0US_V010.doc
Installation Guide LP 33 Series 10-20 kVA
3 INSTALLATION
 
 
3.1 TRANSPORT
The UPS is fixed on transport socket suitable for forklift, which include a special layer of Ethafoam to
protect the equipment against the transport shock. 
Normally the UPS is packaged with carton box. 
On request the equipment can be packaged in wooden case. 
Move the UPS in its original package to the final destination room.
Do not stack other package on top: they could damage the upper side of the cabinet. 
 
NOTE !
When moving the UPS, pay attention to:
FRAGILE
SENSITIVE
TO DAMPNESS
TO HEAT
SENSITIVE
TO FROST
SENSITIVE
Forklift 
The UPS may be lifted with a forklift in upright 
position from right and left side. 
Take note of the center of gravity marked on 
the package. 
NOTE !
Check for sufficient floor and elevator
loading capacity. 
Transport UPS only in upright position. 
Do not stack other package on top of the 
UPS.
Forklift
Crane
Fig. 3.1-1 LP 33 Series lifting
Crane 
If the UPS has to be lifted by crane, use 
suitable carrying belts taking note of the 
center of gravity marked on the package. 
Take all necessary precautions to avoid 
damage to the cabinet while hoisting the 
UPS
WARNING !
When loading / downloading and when 
moving the UPS, it is forbidden: 
When loading / downloading and when 
moving the UPS, pay attention to: