GE Industrial Solutions LP 33 Series 30 & 40 kVA Installation Guide User Manual

Page 33

Advertising
background image

Modifications reserved

Page 33/41

OPM_LPS_3UI_30K_40K_0US_V010.doc

Installation Guide LP 33 Series 10-20 kVA

OFF

ON

OFF

ON

LP 33 Serie

s

E

P1

P13

LPS33U_

030-040_

RPA conn

ection_GE

_04

OFF

ON

OFF

ON

LP 33 Serie

s

1

E

P1

P13

OFF

ON

OFF

ON

LP 33 Serie

s

E

P1

P13

OFF

ON

OFF

ON

LP 33 Serie

s

E

P1

P13

2

3

4

Fig. 3.9.4-4 Control bus location RPA parallel system


Control bus location RPA parallel system
Place the cables and connect them as indicated in the diagram Fig. 3.9.5-4 following these
procedures:

Fix the control bus cables with the appropriate tie-wrapE”.

Place the cables between the parallel units in separated protected conduit to avoid they could

be accidentally interrupted.

Put in place the front screen B (Fig. 3.9.4-1) paying attention to not damaging the control bus

cables.


It is important to place the units in sequence of their assigned number.

A unit number from P1 to P4, is defined by the setting of parameters and displayed on the control
panel
.
This number is also marked inside and outside the packaging.


The standard length of the control bus cable between two parallel unit is 26 ft / 8 m (higher length on

request = up to 50 ft / 15 m).


Maximal overall length of bus connection, between the first and the last unit, should not be longer than

345 ft (45 m).