GE Industrial Solutions LP 33 Series 30 & 40 kVA Installation Guide User Manual

Page 20

Advertising
background image

Modifications reserved

Page 20/41

OPM_LPS_3UI_30K_40K_0US_V010.doc

Installation Guide LP 33 Series 10-20 kVA

NOTE !

A damaged UPS must never be installed or connected to utility or battery!
In case of any damage sustained during the transport, immediately inform the

shipping agent!
A detailed report of the damage is necessary for any indemnity claim.



Packing material recycling
GE
, in compliance with environment protection, use only environmentally

friendly material.
UPS packing materials must be recycled in compliance with all applicable
regulations.

Advertising