Installation checklist – GE Industrial Solutions AF-300 P11_G11 Ethernet Interface User Manual
Page 13
Advertising
Installation
7
Installation Checklist
After installation and wiring, check the following items.
• The wiring is correct.
• No loose wires or screws remain inside the Inverter.
• The screws and terminals are all tight.
• There are no loose threads of wires at terminals that may contact other terminals.
• Inverter parameters such as H30, o27, o28, o31 to o40, are set correctly. (H30: Link Active/Inactive,
o27 and o28: for network loss action, o31 to o40: for fieldbus specific options)
Advertising