Page 35: Aja1 ja2 jb b ja1 ja2
 
3.9.3 Control bus cable location
WARNING !
This operation must be performed by QUALIFIED SERVICE PERSONNEL ONLY before 
the initial start-up. 
ENSURE THAT THE UPS INSTALLATION IS COMPLETELY POWERED DOWN. 
 
 
SGS_400-500_S2_R
PA control bus cab
le_01US
Q1
0 OFF
I O
N
Q2
0 OFF
I O
N
Next Parallel Unit
17
16
4
3
15
14
5
2
13
1
12
10
20
19
9
8
21
7
18
6
11
22
Fig. 3.9.3-1 View electronic module on intermediate unit
Access to the control bus 
connection. 
 
 
The control bus connection 
between parallel units must be 
made on the electronic module 
(P34 – Bus Interface) situated at 
the inside of the UPS door. 
 
 
Next parallel unit
JA
SGSU_400
-500_S2_
RPA contr
ol bus cab
le_02US
A
JA1
JA2
JB
B
JA1
JA2
Fig. 3.9.3-2 Front view electronic module on intermediate unit
Control bus cables connection. 
 
 
• Plug the cables JA
(1/2/3/4/5) and JB 
(1/2/3/4/5) onto the RJ 
connectors JA and JB 
located on parallel bus PCB 
“P34 – Bus Interface” (going 
to “P13 – RPA Board” J52(A) 
and J62(B). 
• Fix both cables JA
(1/2/3/4/5) and JB 
(1/2/3/4/5) to parallel bus 
socket connecting the cable 
shield to ground by means 
the cable clamps “A“.
Modifications reserved
Page 35/41
OPM_SGS_ISG_M40_M50_2US_V021.doc
User Manual SG Series 400 & 500 UL S2